Sign In | Join Free | My chinaqualitycrafts.com
China Jinzhou City Shitan Machinery Equipment  CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.
Verified Supplier

5 Years

Home > Pneumatic Borewell Machine >

Pneumatic 260m Mobile Borehole Drilling Machine Small

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Pneumatic 260m Mobile Borehole Drilling Machine Small

  • 1
  • 2

Brand Name : ShiTan

Model Number : ST-260

Certification : ISO,CE,SGS,TUV,BV

Place of Origin : China

MOQ : 1 set

Payment Terms : T/T, Western Union

Supply Ability : 5000 sets per year

Delivery Time : 7-10 days

Packaging Details : standard export packing

Product Name : 260 Pneumatic Borewell Machine

Drilling Depths : 260Meters

Place Of Origin : China (Mainland)

Model Numbe(m) : ST-260

Voltage : Differ

Open Hole Caliber : 75m'm

Warranty : 1 year

Material : Steel

Condition : New

Contact Now

Pneumatic Well Drilling Rig Crawler Deep Water Drilling Machine 260 Pneumatic Drilling Rig Drilling Equipment

ST 260 Meters Pneumatic Borewell Machine Product Descrption:

Water well drilling rig is suitable for soil layer, quicksand layer, a small amount of rock and soil layer, weathered rock and pebble layer. Easy to install and move. The drilling speed is fast, 20-40m per hour. The working height of the drilling machine is 4m and the non working height is 2m, which is suitable for drilling in any place. Hydraulic drilling machine, low working noise. The water well drilling rig has the advantages of simple design, durability and convenient maintenance. Automatic upper and lower drill pipes, all the thread teeth at the two ends have been heat treated and should not be worn. Hydraulic automatic drilling, light weight, easy to get on and off, equipped with frame, chain block, easy to load and get off. The main power of the drilling rig is 11kw-7.5kw, and the hydraulic power is 7.5-5.5kw. The fully automatic rod lowering device is adopted for the water well drilling rig, which greatly reduces the labor intensity of employees. It takes only 30 minutes to disassemble all 100m drill pipes.

ST260 Meters Pneumatic Borewell Machine Main Parameter:

Drilling Depth
260m
Dia.hole
φ140-260mm
Advance Length one time
63m
Working pressure
1.7-3.0MPa
Air consumption
17-35m³/min
Length of rod
1.5m,2m,3m,6m
Dia. Of rod
φ76, φ89,φ102,φ114
Lifting power
24T
Rotation torque
8500-11000N.m
Rotation Speed
40-70r/min
Diesel Engine
Yuchai
Engine Power
85Kw/2200rpm
Travelling speed
0-2.5 Km/h
Climb capacity
30°
Weight
6000kgs
Dimension

4m×1.7m×2.2m

Application
Complicated geological conditions:Rock,Mud,Sand etc.
Drilling Way
Top drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling
Dth Hammer
4",5",6",8" Drill hammer or CIR110, 130, 150,170

Features:

1.Hydraulic oil pump; parallel transmission design (patent) oil pump single body, power supply adequate distribution reasonable, hydraulic system unique design, simple maintenance cost small.
2.Used with air compressor, can drill 180M, 200M, 300M, 400M, 500M ,600M, 800M, etc.
3.Usually drilling diameter is 6‘’, 8'', 10'', 12'', 14'',etc. According to your needs, we can configure the suitable drill pipe, drill bit and the right model.
4. Power head device; gearbox casting, double motor power supply, torque, durability, maintenance costs are small.
5. Drilling rig chassis; Professional excavator chassis, durable, heavy load bearing, wide chain board, little damage to hard road surface.

What problems should be paid attention to in the operation of pneumatic water well drilling rig

1, When entering the construction site, the rig tower shall be fixed, the area of the drilling site shall be larger than the rig base, and there shall be enough safety space around.

2, When installing the drill pipe, check the drilling rig to ensure that the drill pipe is not blocked, bent and the screw mouth is not worn. Unqualified drill pipes are strictly prohibited.

3, The water well driller must master the operation essentials of the drilling rig and the maintenance knowledge of the Quan surface, and have considerable experience and methods of troubleshooting.

4, The loading of water well drilling rig shall be firm, and the turning or ramp shall be slow and fixed with steel wire fixing points.

Pneumatic 260m Mobile Borehole Drilling Machine SmallPneumatic 260m Mobile Borehole Drilling Machine SmallPneumatic 260m Mobile Borehole Drilling Machine Small

Pneumatic 260m Mobile Borehole Drilling Machine Small

Pneumatic 260m Mobile Borehole Drilling Machine SmallPneumatic 260m Mobile Borehole Drilling Machine Small


Product Tags:

pneumatic mobile borehole drilling machine

      

260m mobile borehole drilling machine

      

pneumatic small borehole drilling machine

      
Quality Pneumatic 260m Mobile Borehole Drilling Machine Small for sale

Pneumatic 260m Mobile Borehole Drilling Machine Small Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)